Newly built composite deck at golden hour

Project Proposal

Your New Deck

Prepared for the Alvarez Family

1847 Orchard View Lane, Wenatchee, WA 98801 · Proposal #2026-0811 · August 11, 2026 · Valid through September 10, 2026

A note from Juan

Dear Alvarez Family, thank you for welcoming me to your home last week. You told me you want a place for summer evenings with the kids, something safe, beautiful, and easy to care for — and after seeing your backyard, I know exactly how to build it. Below you'll find everything: what we'll do, what it costs, and how long it takes. No surprises, no fine print you can't read. — Juan Rodriguez, Rodriguez Construction

What we'll build

Included

  • Removal and disposal of the existing wood deck
  • New 16' × 20' (320 sq ft) elevated deck
  • Concrete footings sized to Chelan County code
  • Pressure-treated structural framing
  • Decking, railing, and stairs per your selected option
  • Building permit and final inspection
  • Full site cleanup, every day

Not included

  • Landscaping or sprinkler repair beyond the deck footprint
  • Patio furniture removal or storage
  • Electrical work beyond lighting included in the Premium option

Choose the deck that fits your family

Three ways to build it — every option is built to the same code and craftsmanship standard.

Essential

The solid, budget-smart build

$18,400

  • Pressure-treated frame and decking
  • Wood post-and-rail guardrail
  • Single staircase to yard
  • 2-year workmanship warranty
MOST POPULAR

Signature

Low maintenance, high beauty

$24,750

  • Composite decking in warm walnut
  • Aluminum balusters, hidden fasteners
  • Wide stairs with lighting-ready rail posts
  • 25-year manufacturer warranty on decking
  • 2-year workmanship warranty

Premium Outdoor Living

The backyard centerpiece

$32,900

  • Premium composite decking
  • Cable railing with cedar top rail
  • Integrated stair + rail lighting
  • Built-in bench seating
  • 25-year manufacturer warranty on decking
  • 2-year workmanship warranty

How the work unfolds

  1. 01

    Demolition

    We remove the old deck and haul away every board and nail.

  2. 02

    Footings

    New concrete footings are poured and inspected before anything is built on top.

  3. 03

    Framing

    The pressure-treated skeleton goes up — this is where strength lives.

  4. 04

    Decking

    Your selected decking is fitted and fastened.

  5. 05

    Railing & stairs

    Guardrails and stairs are installed and checked for safety.

  6. 06

    Final walkthrough

    We walk every inch together — nothing is finished until you say it is.

Timeline

Permit & materials — Weeks 1–2
Construction — Weeks 3–5

Weather in the Wenatchee Valley can shift a build by a few days — we'll keep you updated daily.

Payment schedule

Based on your selected option: Signature

30% — Deposit to schedule your project $7,425
40% — When framing is complete $9,900
30% — After your final walkthrough $7,425
Total $24,750

Built to last. Backed in writing.

Licensed & Insured — WA State 2-Year Workmanship Warranty 25-Year Manufacturer Warranty (composite)

"Juan rebuilt our back deck in three weeks flat. It's the nicest part of our house now."

— Maria S., Sunnyslope

"Showed up when he said he would, every single day. The bid was exactly what we paid."

Ready to move forward?

Accept your selected option below, or call or text Juan with any question — no question is too small.

(509) 555-0142 · Wenatchee, WA

This is a preview — to move forward, call or text Juan at (509) 555-0142.